About this project
The paving works in Rinteln covered excavation, drainage, base course and final laying of concrete block pavers. VL-Innovativbau coordinated earthworks with the landscaping partner so that transitions to existing plantings stayed clean. The drainage concrete base is permeable — no infiltration permit required. Kerbstones were set on concrete base, joints filled with 0/2 mm jointing sand and compacted. Load class N2 approved for cars up to 3.5 t. LED lighting in IP67 was integrated into selected kerb units. 5-year warranty against settling.